FULL KITCHEN RENOVATION — LOS ALTOS, CA
Full Kitchen Renovation in Los Altos, CA
Complete kitchen renovations layout changes, structural work, custom cabinetry, and a full appliance suite, managed start to finish by one licensed team.
Serving Los Altos & the South Bay
- One Team, Start to Finish
- CSLB Licensed & Insured
- Financing Options Available
- Permits & Inspections Handled
- Older Los Altos Home Specialists
Rebuilt From the Studs Out - Managed by One Licensed Team
A full kitchen renovation in Los Altos rebuilds your entire kitchen from the studs out – covering layout, structure, cabinets, counter tops, flooring, plumbing, and appliances. It’s built for homeowners who want a complete transformation, not a quick refresh.
Everything is managed under one permit-first process. We guide you through design, permits, construction, and final walk through as a dedicated kitchen remodelling contractor so you never coordinate trades or the city yourself.
What Counts as a Full Renovation
The word “remodel” gets used loosely. A full renovation rebuilds the kitchen at the structural level — not just swapping finishes.
Plumbing
New supply lines and relocated fixture placement for the new layout.
Electrical
Rewired systems, added circuits, and code-correct outlet placement.
When a Full Renovation Makes Sense
A full renovation fits when
- Your layout no longer works for how you cook and live
- Electrical or plumbing systems are outdated or undersized
- The kitchen feels closed off or disconnected from the home
A lighter scope may fit when
- Cabinet boxes are sound but the doors look dated → refacing
- You only want new countertops and hardware
- No layout, plumbing, or structural change is needed
We review your kitchen and recommend the right scope at a free consultation.
Structural Changes, Explained
Many full renovations remove a load-bearing wall to create an open-concept layout. This requires a structural engineer to confirm the wall can be safely removed and to specify a replacement beam often a steel or LVL beam to carry the load.
It adds time and cost versus a cosmetic update, but it changes how the kitchen feels and functions. Older Los Altos homes with smaller, separated rooms benefit the most.
Handled in-scope
The structural review and beam installation are part of the renovation — not a separate add-on project you have to manage.
Permits and Code Requirements in Los Altos
We handle permit submission and code compliance as standard you don’t research requirements or coordinate with the city.
Permits Handled
Most full renovations in Los Altos require a permit when structure, plumbing, or electrical change. We prepare and submit everything.
Electrical Code
AFCI outlets are required, and electric ranges typically need a dedicated 40 – 50 amp circuit — all wired to code.
Title 24 Energy
California’s energy standard affects insulation, lighting, and HVAC tied to the kitchen. We keep the project compliant.
OLDER LOS ALTOS HOMES
Renovating Older Homes Here
These issues aren’t unusual and don’t derail a project they just need to be planned for early. Our process assesses them before construction.
Electrical Panels
Older panels often carry less capacity than modern kitchens need — especially with smart appliances and added circuits.
Galvanized Plumbing
Common in older builds, it corrodes internally and usually needs replacement during a renovation rather than reuse.
Pre-1978 Materials
Homes built before 1978 may need asbestos testing before demolition, since older flooring and insulation can contain it.
DESIGN & MATERIALS
Design, Materials & Smart Upgrades
Cabinet style, layout flow, and material selection suited to your home and how you actually use the space.
Quartz & Cabinetry
Durable quartz countertops installed alongside custom cabinetry built for your exact layout.
Smart Integration
Built-in connectivity for ranges, refrigerators, and ventilation — plus eco-friendly material options.
How a Full Kitchen Renovation Works
Every renovation follows the same structured sequence – no phase begins before the previous one is properly closed.
01
Free In-Home Consultation
We walk the space with you and learn what isn’t working, what the household needs, the timeline, and the budget. Nothing is sold on the first visit.
02
Design & Layout Planning
We develop the full layout — cabinets, island, appliances, lighting zones, plumbing locations — and identify structural modifications.
03
Written, Itemized Quote
Every line item is quoted in writing before anything moves. The number you approve is the number the project is held to.
04
Permits & Pre-Construction
Applications are prepared and submitted to the City of Los Altos. Demolition doesn’t begin until all permits are approved.
05
Demolition & Structural
The kitchen is removed in full. Wall removal, beam installation, and shoring are completed first and inspected.
06
Rough-In: MEP
Plumbing, electrical, and mechanical are rough-in to code and range venting is ducted out — inspected before walls close.
07
Cabinet Installation
New cabinetry is installed to the approved layout, leveled and secured, with all interior storage components fitted.
08
Countertop Fabrication
Counters are templated on-site, fabricated, and installed with sink and appliance cutouts completed.
09
Backsplash, Flooring & Finish
Tile, flooring, lighting, paint, and hardware are completed throughout the kitchen.
10
Appliances & Final Inspection
Appliances installed and tested, the City final inspection passed, and every punch-list item resolved before close-out.
Design & quote: 1–2 weeks · Permit review: 4–6 weeks · Construction: 10–16 weeks · Total: 4–7 months depending on scope.
Why Choose Kitcheny Remodel
Kitchen Specialists
We operate as kitchen specialists — not a general contractor juggling kitchens as one service among many.
Permit-First Approach
Code requirements and approvals are addressed before construction begins — never discovered midway through.
Deep Local Knowledge
We know Los Altos permit and inspection timelines, so your schedule stays predictable and surprise-free.
Full Kitchen Renovation Cost in Los Altos
Cost depends on scope, structural changes, and finish level. Financing options can be discussed at your consultation. This price below mentioned is just an estimation.
COSMETIC FULL REFRESH
$25,000 – $50,000
New cabinets, countertops, appliances, flooring, and lighting within your existing footprint — no structural changes.
MID-RANGE RENOVATION
$50,000 – $90,000
Layout changes, wall removal, upgraded electrical/plumbing rough-in, and a full premium finish package.
HIGH-END / CUSTOM
$90,000 – $180,000+
Structural changes, custom cabinetry throughout, integrated smart-home systems, and top-tier appliances.
Ranges reflect typical Los Altos & Santa Clara County projects as of 2026. Your exact quote is confirmed in writing before any work begins.
What Los Altos Homeowners Say
Best decision we made this year. Kitcheny Remodel gutted our kitchen and rebuilt it better than we imagined. Worth every penny.
Ryan Mitchell
Honestly didn’t expect it to go this smooth. New cabinets, new counters, whole vibe changed. Kitcheny Remodel nailed it.
Emily Carter
Kitcheny Remodel turned our old kitchen into something we actually love cooking in now. Fast, clean work, no drama. Highly recommend!
Jake Thompson
Frequently Asked Questions
Do I need a permit for a kitchen remodel in Los Altos?
Yes — most full renovations require permits, especially with structural, plumbing, or electrical changes. We handle permit submission as part of our process.
What is the difference between a full renovation and cabinet refacing?
A full renovation rebuilds layout, structure, plumbing, and electrical. Refacing updates the look of existing cabinets without changing the structure underneath.
Can financing help cover the cost of my renovation?
Yes — financing options can be discussed during your consultation based on your project’s scope and preferences.
Do older homes need extra work before renovation starts?
Often yes. Electrical panels, galvanized plumbing, and pre-1978 materials may need assessment or replacement before construction begins.
Can you remodel a kitchen inside an ADU?
Yes — ADU kitchens are part of our services and usually benefit from a full layout rebuild rather than a partial update.
How long does a full kitchen renovation take?
Typically 4–7 months end to end, depending on permit approval and structural scope. We give a project-specific timeline after reviewing your kitchen.
Full Renovations Across Los Altos & the South Bay
We provide kitchen remodeling across Los Altos, Los Altos Hills, and surrounding communities.
Hillside estates and larger kitchens with premium finish expectations.
A wide range of home vintages, mid-century to recent construction.
High-value homes where finish quality is closely scrutinized.
Strong inventory of 1950s–70s homes ready for updating.
Established neighborhoods with elevated finish standards.
Ultra-premium homes requiring the highest material quality.
MORE FROM KITCHENY
Other Kitchen Services
Cabinet Refacing
When the boxes are sound and the layout works but doors and hardware need replacing.
Cabinets & Countertops
New custom or semi-custom cabinetry with natural-stone countertop fabrication.
Small Kitchen Remodel
Galley and single-wall layouts updated through smarter cabinet planning and storage.
Kitchen Design Consultation
A full overview of everything we offer for kitchen projects in Los Altos.
GET STARTED
Start Your Full Kitchen Renovation in Los Altos
Call Kitcheny Remodel for a free in-home consultation. We walk your kitchen and assess whether a complete renovation is the right scope. If it is, you get a written, itemized quote covering every phase. If not, we tell you why.